Moving from SAP to 1C means transferring processes built over years into a system with different logic, structure and capabilities. Preparing for such a move is a separate stage that determines how manageable the implementation itself will be. Using a project with a large chemical concern as an example, we explain how we conduct a pre-project survey and why a Business Requirement Review (BRR) is needed.
The Russian division of the chemical concern uses SAP as its accounting system, heavily customised for the company's processes. When the question of moving to a Russian solution arose, 1C:ERP was chosen: an integrated management system that brings finance, production, sales, procurement and warehouse together in a single environment.
The company turned to UCMS Group as a partner with a proven track record: we have been running payroll and HR administration for this client since 2020 and had already implemented 1C:ZUP and employee self-service portals.
Sergey Pulnikov, head of the consulting department at UCMS Group:
“Because we already had joint experience of implementing 1C, the client had seen how we work: we do not just launch the system and leave, we stay until employees are confident working in it.”
At the same time it was important not just to reproduce the old model but to make it manageable: so that when a new cost item appears or parameters change, there is no need to go into the code and everything can be reconfigured through reference books.
Read also:A case study on HR administration at the same company
Every implementation at UCMS Group starts with a pre-project survey and the preparation of a BRR: a description of the client's business processes. It is not a dry technical specification but a document written in plain language that an accountant, a procurement specialist, a department head and a developer can all read, understand and approve. The BRR helps align expectations between the client and the provider and reduces the risk of unnecessary customisations and misunderstandings during implementation.
For a large project like this one, we prepare a separate BRR for each block: finance, warehouse, procurement, credit management and so on. Methodologists, analysts and developers work on each one, which makes it possible to validate every decision both from the business logic side and from the implementation side.
Sergey Pulnikov, head of the consulting department at UCMS Group:
“First you immerse yourself in the company's processes and almost become its employee. Then you take each process and try to map it onto 1C logic: some things are covered by standard functionality, and for others you realise customisation is needed. It is a huge amount of very interesting analytical work.”
In this project we tried to rely on the standard functionality of 1C:ERP as much as possible: it makes the system easier to maintain and safer to update. Where standard blocks were insufficient, we customised them or designed them from scratch.
Examples of customising standard blocks
We added to the standard retro-bonus functionality a link to the counterparty's line of business and region, the ability to accrue daily and to set the bonus as a fixed amount. We developed an additional document to automatically reflect the retro-bonus reserve in statutory accounting.
What we designed from scratch
We also developed a report on remaining limits that shows how much of the contract limit has already been used. If the remaining limit is less than 20%, the figure is highlighted in red. Access to the report is granted via the access matrix, subject to restrictions.
We added an allowed deviation field to the contract card: a small excess over the limit within a given percentage goes through without additional approval. For example, contracts flagged as a framework agreement have a separate approval process with mandatory review by the procurement department manager.
A pre-project survey and the BRR determine how smoothly the move from SAP will go: when processes are recorded, decisions approved and every department understands how its part of the system will work, the implementation itself becomes predictable.